Enerpower & Lidl
End-to-end solar PV project delivery including design, supply, installation, and commissioning of rooftop PV array and associated electrical systems.
Kellihers Electrical Waterford
Lidl’s new distribution centre required a large-scale, robust solar solutions that could be integrated with the site’s operations and rooftop geometry.
The project needed a reliable system design to accommodate over 4,200 panels, a secure flat-roof mounting solution, high-efficiency inverters, and a bespoke rooftop inverter framework.
The work had to be completed to tight deadlines while delivering measurable carbon and cost savings to support Lidl’s renewable energy targets.
Kellihers Electrical Waterford and Enerpower led the project from concept through to handover, delivering a turnkey Solar PV solution tailored to the Newbridge facility.
Key elements included:
Successful delivery and commissioning of Ireland’s largest rooftop PV installation at the time in 2022.
The PV installation now generates over one quarter of the distribution centre’s energy requirements.
Estimated annual carbon emissions reduction of approximately 473 tonnes CO2, equivalent to the annual energy use of around 240 homes.
Demonstrated commercial viability of large-scale rooftop solar for retail distribution facilities, helping Lidl reduce energy costs and future carbon-related taxes while reinforcing sustainability commitments.
All products supplied by Kellihers Electrical Waterford.
|
Product Name
|
|---|
|
High-Efficiency SMA Tripower Inverters
|
|
SMA Inverter Manager
|
|
Van der Valk ValkPro+ East/West Flat Roof Frame
|
|
Cables, Switchgear and Containment
|
|
Bespoke Rooftop Inverter Mounting Framework
|
Please note: This project was completed in 2022 and the products listed above reflect the original specification supplied at that time.
Product lines, suppliers and technical standards have advanced since then, so these specific items may not be current or recommended for new projects today.
For up-to-date component selection and the best fit-for-purpose solutions, please contact Kellihers / Rexel Energy Solutions for current product availability, performance data and compliance information. [link to contact]